Piling pipe production process

Sources: this site    Click:    Date: 2016-8-2 17:52:5
Spiral Pipe is a strip coil as raw material, often warm extrusion molding, automatic double wire-sided submerged arc welding process welded spiral seam steel pipe.
(1) raw materials that strip, wire, flux. We must go through rigorous physical and chemical testing before it is put.
(2) strip head and tail docking, single or double wire submerged arc welding, in rolled steel by automatic submerged arc welding.
(3) before forming the strip after flattening, cutting, trimming, planing, surface cleaning conveyor and I crimping process. (4) the use of electric contact pressure gauge to control both sides of the conveyor pressure cylinder pressure to ensure the smooth delivery of the strip.
(5) the use of internal or external control roll forming.
(6) adopted the weld gap control device to ensure the weld gap to meet the welding requirements, diameter, the wrong side and the weld gap have been strictly controlled.
(7) within the welding and soldering are used outside the United States Lincoln welding machine for single or double wire submerged arc welding, thereby obtaining a stable welding specifications.
(8) finished welding the weld line continuous ultrasonic injury checks to ensure 100% coverage of non-destructive testing of spiral weld. If defective, automatic alarm and spraying tags, production workers so adjusting the process parameters, and remove defects.
(9) by air plasma cutting machine will cut a single tube.
(10) cut into a single steel pipe, each consisting of three steel head to conduct strict inspection system, the mechanical properties of the weld inspection, chemical composition, fusion status, steel pipe surface quality and after NDT inspection to ensure that the process pipe after passing to formally put into production.
(11) with a continuous sonic flaw marks the site of the weld, manual ultrasonic and X-ray review, if there are defects after repair again after destructive testing, until the confirmation defect has been eliminated.
(12) strip butt weld and intersect with spiral weld small joint where the pipe all through the X-ray television or film examination.
(13) of each pipe after hydrostatic test pressure radial seal. Test pressure and time by the steel pipe pressure microcomputer detection device strictly controlled. Test parameters are automatically printed record.
(14) pipe end machining, so that the end vertical, bevel and blunt edge be accurately controlled.