ERW Steel Tubing 12inch ASTM A53 B SCH40

Sources: this site    Click:    Date: 2016-4-24 22:44:42

Abter Steel Pipe can supply you API 5L Gr. B, ASTM A53 B ERW Steel Tubing and Pipes for your gad and oil line pipe or water pipes. It’s getting larger and larger demand in the energy and construction fields for ERW welded pipe and tube.

ERW (Electric resistance welding) refers to a group of welding processes such as spot and seam welding that produce coalescence of faying surfaces where heat to form the weld is generated by the electrical resistance of material combined with the time and the force used to hold the materials together during welding. 

12inch ERW Steel Tubing is one common size for oil and gas projects application, Abter supply more than 5000 metric tons of ERW Pipe per month to customers from Africa, Middle East, Europe countries and gets very satisfaction from them.

Specification of ERW Steel Tubing 12inch ASTM A53 B SCH40

Product NameERW Steel Tubing 12inch ASTM A53 B SCH40
ERW Steel Tubing Diameter12 inch / 323.9mm
Diameter Tolerance320.661mm ~ 327.139mm (acc. to ASTM A53, +/-1% of outside diameter)
Wall ThicknessSCH 40 / 10.31mm
Wall Thickness Tolerance9.02mm ~ 11.59mm (acc.  to ASTM A53, +/- 12.5% t)
Pipe StandardASTM A53, API 5L, CSA Z245, A106, ASTM A252, AS 1163, IPS 190 etc
Steel GradeGR A, GR B, X42, X46, X52, X56, X60, X65, X70, S275J2H, S275J0H, S275JRH, S355J2H, S355J0H, S355JRH etc.
ERW Steel Tubing TestHydro test, UT test, Flatten test, Impact test, DWT test if agreed etc
Hydro test pressure1340 psi / 9200 kPa 
ERW Steel Tubing LengthSRL, DRL, Random length from 3m to 18m
ApplicationFluid pipe, line pipe, water pipe, structure steel tube, piling pipe, construction pipe, bridge pipe etc.
ERW Steel Tubing CoatingBlack painting, varnish, anti rust oil, FBE, 3PE, 3 layer PE, 3PP etc.
PackagePlastic caps on both ends, Steel bundle, or acc. to customers’ request
ERW Steel Tubing InspectionISO9001, SGS,BV, GL, Moody  or other TPI appointed by customer
Capacity10000 metric tons per month
ERW Steel Tubing Delivery time30 days against deposit or LC at sight